Safe Isolation Provider (SIP)

An accredited Safe Isolation Provider (SIP), we supply and install isolator switches between the meter and electrical equipment across your residential and commercial property portfolios, for both single and three phase power supplies.

Enquire now

Isolator Switch Installation

A metering and electrical contracting expert with more than 25 years’ experience in the UK utility industry, SMS works with our partners in the domestic and commercial property sectors – including social housing and private landlords – to provide safe isolation switch installation at scale.

Working with an accredited Safe Isolation Provider (SIP) like us ensures that you are compliant with new regulations, and that your electrical team can seamlessly and safely carry out planned or emergency downstream maintenance and upgrades.

We install isolator switches for:

House with EV charger icon
Local Authorities & Housing Associations
three houses icon
Private Landlords (Residential & Commercial)
lightning bolt icon
Electrical Contractors

What is a Safe Isolation Provider? The lowdown...

Question mark icon

Who can install an isolator switch?
Since June 2023, only registered Safe Isolation Providers (SIPs) can legally carry out safe isolation works, which includes the installation of isolator switches and the de-energisation and re-energisation of the meter point to allow for safe working on a customer’s electrical equipment. It’s important to note that only Meter Equipment Managers (MEMs) accredited by the Retail Energy Code can legally serve as a registered SIP.

Question mark icon

DCP 394: what it means for you
New DCP 394 regulation means that any party wishing to undertake isolation works can now contract independently with any accredited Meter Equipment Manager (MEM) registered as a SIP, rather than having to use the MEM appointed by the end-consumer’s energy supplier (as was the case prior to DCP 394). This provides greater convenience for local authorities and landlords who require works across their estate, but whose tenants are typically supplied by multiple different utility providers.

utility connections brochure

Multi-Utility Infrastructure Brochure

Find out more about our dedicated service to design and manage your utility projects in their entirety.

Utility Infrastructure Brochure

Why work with us?

We are one of the only Safe Isolation Providers operating in the market to offer a true end-to-end service for your safe electrical isolation procedure and isolator switch installation.

Standards icon
Registered & Accredited

We're registered through the Retail Energy Code (REC) as an accredited Safe Isolation Provider (SIP), meaning we're an electrical partner you know you can trust.

work icon
Industry Expertise

Counting on almost 30 years as one of the UK's leading electrical contractors and meter operators.

An icon showing a persons head and shoulders with a tick in front of it
End-to-End Project Management

Including all aspects of tenant liaison and scheduling through our dedicated project management team

headset with microphone icon
Communication

We manage all industry communications and approvals with the Network Owner & Meter Operator

Icon showing a clip board and a pen
Safety Reports

Provision of reports and remedial advice on any unsafe installation identified

Installation icon
Nationwide Coverage

Our team of installers cover every corner of Great Britain.

Contact us for a free consultation

Our expert utility consultants and engineering team are on hand to discuss your safe electrical isolation project. Just leave your contact details to arrange a call back, and we’ll be in touch!

    Get in touch with us today

    *Indicates required field

    Thank you for reaching out!

    A member of our team will get back in touch with you as soon as possible.

    Return to the top of the page

    Discover more

    Discover more

    Construction Case study

    Tai Tarian

    Find out how we helped Tai Tarian, one of the largest social landlords in Wales with over 9,000 properties across the Neath Port Talbot County Borough, with this complex utility infrastructure project.

    Discover more
    Big Yellow Storage Building Case study

    Big Yellow

    We have worked alongside Big Yellow Self Storage since 2006, providing a wide range of utility infrastructure services on over 50 Big Yellow developments.

    Discover more
    Solar panels Case study

    INRG Solar

    How we assisted INRG, a company with one of the UK's largest solar PV portfolios, with this challenging embedded generation connection at a 4.99 MW solar farm.

    Discover more